Engineering projects
Boiler burner replacement with a capacity of 32 millions Btus/hour
Date: 2022
Location: Smucker Foods, Sherbrooke
Pyro-air successfully conducted an analysis of the power required to replace a 32 MM Btus burner on a steam boiler in the food industry. This project included the selection and replacement of the burner, modification of the refractory, connection of new controls, commissioning, and CSA approval in accordance with the current code.
This challenge has stimulated our engineering department and has elicited pride from all stakeholders. Our commitment to customer satisfaction is our main reward, thus reinforcing our reputation for excellence and innovation.