Location: Smucker Foods, Sherbrooke

Pyro-air successfully conducted an analysis of the power required to replace a 32 MM Btus burner on a steam boiler in the food industry. This project included the selection and replacement of the burner, modification of the refractory, connection of new controls, commissioning, and CSA approval in accordance with the current code.
This challenge has stimulated our engineering department and has elicited pride from all stakeholders. Our commitment to customer satisfaction is our main reward, thus reinforcing our reputation for excellence and innovation.

This site uses cookies to ensure its proper functioning, improve performance, analyze use, personalize content and offers and then display targeted advertisements based on the information you have provided or that they have collected on social networks and other third-party sites. These cookies cannot be refused.

Read more